Immediacy Hypermediacy and Remediation Class Presentation
Masters of Digital Media (UNSW), Screen Culture class presentation. Update: link to my short film major work;www.youtube.com Unlisted, can only be viewed through this link. Writer | Presenter | Shooter | Editor Subject: Immediacy, Hypermediacy, and Remediation in the Digital Culture Audience: tutor and fellow class mates. The video was designed to be played on a projected screen in class as part of my face-to-face presentation, in which hand over the presentation to my 'remediated' self. At the end of the video I hand back to my 'real' self, at which stage I explained the revelation referred to at the end of the video... that most of my career is been processing remediated media. This piece took me 1.5 hours to write, 2.5 hours to shoot, 1 hour to cut. Yes, I cram for my assignments.
One of the lingering problems left by hurricane Ike is Mold. SodaBlast Systems is an amazing solution to the mold problem. For more information go to SodaBlastRemediators.com.
Mold Remediation on Modern Marvels
See how dry ice blasting is used for mold remediation in this Modern Marvels segment from the History Channel. Dry Ice Blasting is more thorough and quicker than conventional mold remediation because its -109 degree temperature kills the mold on contact; the kinetic energy removes the mold instantly while sterilizing and sanitizing the wood surface and is also drawing moisture out of the wood, thus preventing future mold growth.
Video Rating: 5 / 5

Environmental Remediation System
Video Rating: 0 / 5
Latest Remediation News
City agrees to shut down REMCO document repository
The Willits Environmental Remediation Trust requested, and the Willits City Council has approved, shutting down the REMCO document depository and converting to internet-only access in 2011. According to Dr.
Read more on The Willits News
HILLSBOROUGH: Merdinger is townâs new administrator
Michael Merdinger, a former Hillsborough committeeman and current Planning Board member, has been hired to succeed Township Administrator and Clerk Kevin Davis.
Read more on Hillsborough Beacon
Feinberg Says Half of Billion BP Fund Should Cover Claims
Kenneth Feinberg, the lawyer paying victims of BP Plc’s Gulf of Mexico oil spill, said he anticipates about half the $ 20 billion fund set up by the company should be adequate to cover claims for economic losses.
Read more on BusinessWeek
D-Tank Remediation Project at Brookhaven National Laboratory in the early 1990′s; Long Island, NY.
Some cool contamination images:
D-Tank Remediation Project at Brookhaven National Laboratory in the early 1990's; Long Island, NY.

Image by David C. Foster
Working with supplied air. The removeable coating on the crane was applied too thin and could not be effectively removed. It didn't really matter since the engine was internally contaminated and could never get unrestricted free release. The crane was cut up and packed in B-25's boxs and a 20 foot sealand container for burial. The contaminated aerial lift was sent to Hake in Memphis to be used in a contamination area. The tent structure also ended up at Hake and was still in storage there five years later.
One of these plates is contaminated

Image by Niharb
I tried hard to capture what was easy to see with the eyes, but all I got was this. The plate on the bottom is contaminated, if you look hard enough you can see that the media is slightly orange-y which is a sign of contamination. Fungus contamination changes the pH of the cell media and there is a indicator included in it that changes colour to indicate contamination.
Remco

Image by Beedle Um Bum
The old Remco Hydraulics plant at 934 S. Main St. on the west side of Highway 101 (S. Main St.) across from Safeway. The Willits Arch and Skunk Train tracks are just to the left of this photo.
These buildings were originally the Harrah Brothers Machine Works, which built sawmill equipment. Eventually they came to specialize in making hydraulic cylinders and the name was changed to Remco. In the early 1960s, the company began doing chrome plating of its cylinders, and then expanded to do plating of other sorts.
Toxic materials used in the plating process were stored in large underground tanks (that were below the water table), and waste solutions were discharged into the nearby Baechtel Creek.
Remco was owned by several corporations over the years, and the plant finally closed in 1995. It remains vacant awaiting final remediation of the toxic contamination.
Radon Mitigation 1-800-420-3881. How to Install Exterior Radon Remediation System
www.MitigationSystem.com - Radon Mitigation 1-800-420-3881. Installed by Air Quality Control Agency, America's Largest Radon Company. How to Install Exterior Radon System. Radon Abatement System Installation Video. Two Story (2-story) Radon Remediation with Outside Fan.

Chemical Free safe mold remediation Pro Blast USA. DL Home Solutions and Feels Like Home LLC use the safest and most effective method possible to remove mold. Recently the process of spraying chemicals and painting the attic space has been banned in areas like NYC. The method shown here has proven to be safe and effective for years.